Skip to product information
1 of 9

After Dark USA

ZeroCurve Zero Gravity Yoga Sex Chaise

ZeroCurve Zero Gravity Yoga Sex Chaise

Regular price $214.99 USD
Regular price $0.00 USD Sale price $214.99 USD
Sale Sold out
Shipping calculated at checkout.

4 bought this month

Color
Quantity

Description

Specifications

Product Type: Zero-Gravity Intimacy Sex Chaise

Foam Core: High-density polyurethane foam

Design: Ergonomic curved S-shape

Support: Zero-gravity positioning

Cover: Removable machine-washable cover

Packaging: Vacuum compressed

Expansion Time: Up to 72 hours

Width: 18 inches

Construction: Solid foam interior

Use: Intimacy positioning, stretching, relaxation

Portability: Lightweight and easy to move

Category: Sex chaise, intimacy furniture, positioning chaise


Why You'll Love It

Zero-Gravity Ergonomic Support

The curved design follows the natural S-curve of the body, promoting a zero-gravity position that helps relieve pressure on the spine and joints while supporting comfortable positioning.

High-Density Foam Comfort

The polyurethane foam core delivers a soft yet supportive feel, helping maintain comfort during extended lounging or positioning.

Versatile Intimacy Positioning

The curved structure supports multiple positioning angles, helping enhance comfort and flexibility.

Removable Machine-Washable Cover

Easily maintain cleanliness with a removable washable cover designed for everyday use.

Durable Solid Foam Construction

The solid foam interior provides long-lasting support while maintaining shape over time.

Compact & Easy To Move

Lightweight construction makes it easy to reposition throughout your space.

Vacuum Packed For Easy Delivery

Arrives vacuum compressed for transport efficiency. Allow up to 72 hours for full expansion and firmness.


How to Use

Remove chaise from packaging

Allow up to 72 hours for full expansion

Place on flat surface

Position body along curved support

Adjust positioning for comfort


Care Instructions

Remove and machine wash cover when needed

Allow cover to fully dry before reassembly

Spot clean foam interior if necessary

Store in clean, dry environment


Frequently Asked Questions (FAQ)

Does this chaise require assembly?

No assembly required. Simply allow time for expansion.

How long does expansion take?

Up to 72 hours for full firmness.

Is the cover washable?

Yes, the cover is removable and machine washable.

Is the chaise lightweight?

Yes, the lightweight design makes it easy to move.

Does this provide ergonomic support?

Yes, the curved design supports the natural S-curve of the body.

Privacy Guaranteed

Every order is shipped in plain, unmarked packaging — your privacy is always our priority.

View full details

Safety & Legal Disclaimer – After Dark

Adults 18 and over only. All products on this site are intended solely for adults aged 18 or older (or the age of majority in your location, whichever is greater). By using this site or making a purchase, you confirm that you meet this requirement. Store all products safely and keep them out of reach of children and pets.

Read and follow all instructions. Before using any product, read and follow the manufacturer's included instructions, warnings, and labels. The items sold here are adult novelty and intimate-wellness products. They are not medical devices and are not intended to diagnose, treat, cure, or prevent any condition. If you have a health condition, are pregnant or nursing, or take medication, consult a qualified healthcare professional before use. Discontinue use and seek medical attention if you experience pain, bleeding, irritation, an allergic reaction, or any adverse effect.

Cleaning and material sensitivities. Clean each product before and after use according to the manufacturer's guidance. We do not manufacture these products and cannot guarantee how any person will react; if you have known allergies or sensitivities, review the product's materials before use.

Insertable products. Never force any product, and use each item only as intended. For anal use, choose only products designed with a flared base or retrieval cord to prevent loss or injury. Urethral products (plugs, sounds, and dilators) present an elevated risk of injury and infection. They are not medical devices, are not intended to treat any condition, and should be used only by experienced adults observing strict hygiene and the manufacturer's instructions. Discontinue use and consult a physician if you experience pain, bleeding, difficulty urinating, or any sign of infection.

Restraints, bondage gear, and weight-bearing furniture. Many products on this site — including restraints, swings, benches, and other furniture — are weight-bearing or restrictive. Always observe the stated weight limits, load ratings, and assembly and mounting instructions, and inspect all hardware and attachment points before each use. Never leave a restrained person unattended, always keep a means of quick release within reach, use a safe word or signal, and stop immediately if anyone is in discomfort or distress. Improper use of restraint or suspension equipment can cause serious injury.

Powered and rechargeable products. Never use any product while it is charging. Even where a product is described as waterproof or splash-resistant, avoid prolonged submersion. Charge and store all products per the manufacturer's instructions.

General notes. Remove any wearable accessories before sleeping or bathing. Colors, sizes, and appearance of apparel and other items may vary slightly from the images shown.

Your responsibility. By purchasing or using any product referenced on this site, you agree to use it safely, responsibly, and in accordance with the manufacturer's instructions and all applicable laws. Nothing on this site constitutes medical, legal, or professional advice. You assume all risk arising from misuse or from failure to follow product instructions and warnings, to the fullest extent permitted by law.

⚠️ Proposition 65 Warning (California)

WARNING: This product can expose you to chemicals including di(2-ethylhexyl)phthalate (DEHP), which is known to the State of California to cause cancer and birth defects or other reproductive harm. For more information, go to www.P65Warnings.ca.gov.